**IMPORTANT DETOUR INFORMATION LISTED BELOW
http://www.mapquest.com/maps?city=North+Wales&state=PA&address=513+Dickerson+Road&zipcode=19454
Directions
Gym Address:
513 Dickerson Road, North Wales, PA 19454
215-699-2900
From PA Turnpike
Take Turnpike to Fort Washington exit
After you go through the tolls, stay to the right
Take rt 309 North
Get off at the Norristown Road Exit
Make a left at the light at the end of the ramp
Norristown Road Turns into Summneytown Pike
Go through the town of North Wales
You'll pass a Recreation Park on the left and then come to a light
At this light, there is a TD Bank and Boston Style Pizza. Turn right onto
Dickerson Road
The gym is 4th Dirveway on the righthand side (Additional Parking at the 5th
Driveway on Right)
From Rt 476 (Northeast Extension)
Take Rt 476 to exit 31 (Lansdale)
At the end of ramp turn left at the light onto Sumneytown Pike
Keep going until you go under a small stone bridge
You'll come to a light with the "Sumneytown Tavern and Genuardis" - go thru
light to lext one.
At the next light, on the lefthand side there is a TD Bank and Boston Style
Pizza.
Turn right onto Dickerson Road
The gym is 4th Dirveway on the righthand side (Additional Parking at the 5th
Driveway on Right)
From Rt 309
Take North Wales Road towards North Wales (Walgreens and former Circuit City)
You get to a "Y" in road with a WAWA
Take right "Y" onto Beaver Street
Make your first right (immediately after RR tracks) onto Wissahickon Ave
Make your first left onto Dickerson Road
Pass Industrial Dr on left and the gym will be on your left 2 driveways after.
You may also park in 1st lot after Industrial Drive
IMPORTANT DETOUR INFORMATION LISTED BELOW!
Construction on the Sumneytown Pike Road Widening
Project will resume on March 1, 2010. Starting March 1st Sumneytown Pike from
Allentown Road to Church Road will be closed allowing local traffic only. The
detour route will be clearly marked with signs taking motorists to the alternate
route on Morris Road. Only local business traffic will be permitted within the
work zone. This detour will be in place from March 1st until December of 2010
to facilitate utility relocation and the full roadway reconstruction of
Sumneytown Pike and the reconstruction of the existing railroad bridge.
During April and May of 2010, the final work on
Sumneytown Pike from Church Road to Beaver Street will also occur. The majority
of this work will occur at night between 7:00 PM and 7:00 AM when pavement
patching and re-surfacing will occur. Motorists should be aware of sporadic day
operations impacting traffic with temporary lane closures between the hours of
9:00 PM and 3:00 PM.
